Customer Name |
Chemtech Environmental Ltd |
Location |
Stanley, County Durham |
Building Use |
Soil Analysis & Environmental Contamination Testing Lab |
Size of Building/Construction |
20,000 sq.ft fully insulated modern portal frame unit |
Heaters |
Three XR50 Plus Warmco/Winterwarm suspended unit heaters |
Fuel Supply |
Natural gas |
Ancillary Equipment |
Three DB8 control panels |
Customer Brief:
Warmco installed an energy efficient factory heating system for Chemtech Environmental Ltd in May 2023. Warmco were asked to install three Winterwarm, natural gas fired, suspended, space heaters, into this 20,000 square foot, manufacturing facility in Stanley, County Durham.
Features of the Heating System:
The 20,000 square feet area within these manufacturing premises was not being adequately heated by three Combat CUHA gas unit heaters, which had faulty heat exchangers. Our customer invited us to install a modern, efficient factory heating system, which could get the space up to the target temperature quickly. To do this, we installed three Winterwarm, XR50, gas fired, suspended unit heaters, which each have a maximum heat output of 50.7kw, to get the space quickly to a high temperature. Then once the thermostat detects that this has been achieved, the heater has the capacity to modulate its heat output down to 31.5 kw, to top up the heat, as required. This 95.6% nett efficient product, can offer a fuel cost saving of up to 30% against standard non-modulating models. (These heaters comply with ErP as determined by EU 2015 / 1188, they have a ten-year warranty on their heat exchangers, and they carry a 2-year parts and one year labour warranty). This factory heating was installed over a three-day period. By working closely with the site supervisors, and employing the services of our approved roofing contractor to seal the flues, our engineers were able to minimise any potential disruption to the customer’s all-important manufacturing activities.